
Discipline / 04
Electrical & Instrumentation
LV and HV electrical installation, hazardous-area work, instrument loops and full loop-check commissioning.
Overview
Power and control across the vessel — switchboards, cable runs, lighting, motors, instrument loops and control panels. Hazardous-area work is executed and inspected by Ex-certified technicians, with loop folders and megger records handed over at completion.
Executed to
- IEC 60092 — Electrical Installations in Ships
- IEC 60079 — Explosive Atmospheres (Ex)
- IEC 61892 — Mobile and Fixed Offshore Units
- SS 638 — Singapore Code of Practice for Electrical Installations
Scope of works
- LV and HV cable pulling, glanding and termination
- Switchboard, MCC and distribution panel installation
- Hazardous-area (Ex) installation and inspection
- Instrument installation, calibration and loop checking
- PLC, control panel and junction box wiring
- Navigation, deck and emergency lighting systems
- Insulation resistance, continuity and earthing tests
- Loop folders, test records and as-built cable schedules
Gallery
Electrical & Instrumentation in the field.





Next Project
Have a scope,
a vessel, a deadline?
Send the specification. We respond with scope, schedule, and the crew sized to deliver it — typically within one working day.
Vessel and shutdown callouts answered 24/7.
