Electrical & Instrumentation

LV and HV electrical installation, hazardous-area work, instrument loops and full loop-check commissioning.

Overview

Power and control across the vessel — switchboards, cable runs, lighting, motors, instrument loops and control panels. Hazardous-area work is executed and inspected by Ex-certified technicians, with loop folders and megger records handed over at completion.

Executed to

  • IEC 60092 — Electrical Installations in Ships
  • IEC 60079 — Explosive Atmospheres (Ex)
  • IEC 61892 — Mobile and Fixed Offshore Units
  • SS 638 — Singapore Code of Practice for Electrical Installations

Scope of works

  • LV and HV cable pulling, glanding and termination
  • Switchboard, MCC and distribution panel installation
  • Hazardous-area (Ex) installation and inspection
  • Instrument installation, calibration and loop checking
  • PLC, control panel and junction box wiring
  • Navigation, deck and emergency lighting systems
  • Insulation resistance, continuity and earthing tests
  • Loop folders, test records and as-built cable schedules
Gallery

Electrical & Instrumentation in the field.

Electrician working inside a switchboard panel
Instrument calibration and loop checking
Cable termination in a control cabinet
Hazardous-area electrical inspection
Next Project

Have a scope,
a vessel, a deadline?

Send the specification. We respond with scope, schedule, and the crew sized to deliver it — typically within one working day.

Vessel and shutdown callouts answered 24/7.